Sample data — a demonstration workspace with synthetic projects. It is the real product, not a mock-up: what you change here is really recorded, in a sandbox of your own.Sign up →
Add Update Catch up 1
HomeYour review queue — what needs you, what changed
Add a decision, commitment, person or event
Needs your sign-off6 proposed
What happens when I approve? Do I need to lock it?

Approving makes a fact Agreed — that is official and in effect on the record right away. You do not need to lock it.

Locking is optional extra protection: it freezes the wording so it cannot be changed without a fresh sign-off. Lock only the facts you want frozen.

Payment terms (Variation No. 3): the notified sum is paid Net-30 from the date of the payment notice — the Net-15 proposal was not adopted
Decision PROPOSED Northgate v. Tarrant M&E · Sep 2
Adds a new fact — nothing on the record is replaced.
Proposed for the record — your sign-off makes it official (MEMRY won't add it on its own).
The Schedule 2 insulation-resistance minimum is confirmed at 2.0 MΩ measured at 500 V d.c.
Decision PROPOSED Northgate v. Tarrant M&E · Sep 2
Adds a new fact — nothing on the record is replaced.
Proposed for the record — your sign-off makes it official (MEMRY won't add it on its own).
Diarise a chaser to Voss & Crane the day after each Tarrant deadline
Decision PROPOSED Northgate v. Tarrant M&E · Sep 2
Adds a new fact — nothing on the record is replaced.
Proposed for the record — your sign-off makes it official (MEMRY won't add it on its own).
Switch floors 11-14 to a bonded post-tensioned slab
Decision PROPOSED Riverside Tower · Sep 2
Adds a new fact — nothing on the record is replaced.
Proposed for the record — your sign-off makes it official (MEMRY won't add it on its own).
Add a 5-day liquidated-damages buffer to the Korso floors 7-9 milestone
Decision PROPOSED Riverside Tower · Sep 2
Adds a new fact — nothing on the record is replaced.
Proposed for the record — your sign-off makes it official (MEMRY won't add it on its own).
Memry-drafted: Riverside Tower — weekly client update (week 36)
Activity PROPOSED Riverside Tower · Sep 2
Adds a new fact — nothing on the record is replaced.
Proposed for the record — your sign-off makes it official (MEMRY won't add it on its own).
This conflicts — review8 open
Set the brand relaunch for 2026-12-05 to land with the Vantage Health framework submission
blocking Northgate brand refresh
New information clashes with a fact you have locked — review both and decide.
Review
Korso penalty of £24,000 accrues from original due date 2026-08-17 per CNT-001 §5.1; no waiver issued
blocking Riverside Tower
New information clashes with a fact you have locked — review both and decide.
Review
Floor 5 concrete pour scheduled 2026-09-08 (floor 6: 2026-09-09)
blocking Riverside Tower
New information clashes with a fact you have locked — review both and decide.
Review
The specified insulation-resistance minimum is 2.0 MΩ (Agreement Schedule 2)
blocking Northgate v. Tarrant M&E
New information clashes with a fact you have locked — review both and decide.
Review
Payment terms are Net-30 from the payment notice (Agreement clause 4)
blocking Northgate v. Tarrant M&E
New information clashes with a fact you have locked — review both and decide.
Review
Subcontract applications are paid Net-30 from the date of our payment notice, and a shorter term on a supplier invoice has no effect
blocking Fleet Street M&E package
New information clashes with a fact you have locked — review both and decide.
Review
The Level 3 second fix was released to the finishes trades 2025-07-09 — 12 days late (Northgate handover log)
advisory Northgate v. Tarrant M&E
New information clashes with a fact you have locked — review both and decide.
Review
Purchase order PO-0231 commits £27,000 to Meltham Flooring for the Fleet Street floor finishes
advisory Fleet Street M&E package
New information clashes with a fact you have locked — review both and decide.
Review
Due soon5 overdue · 7 within 7 days
Send the drafted chaser to Tom Cassidy on the Riverside Court slab penetration positions — Tom Cassidy
due Sep 3 Riverside Court refurbishment
Draft a nudge ↗
Confirm the Halcyon tea-point joinery quantities so the six-week lead time can start — Halcyon Joinery Ltd
due Sep 4 118 Fleet Street — first fix
Draft a nudge ↗
Close the payment-terms query on Tarrant invoice INV-4471 and confirm the due date from the order — Rachel Thorne
due Sep 5 Fleet Street M&E package
Draft a nudge ↗
Agree the Tarrant M&E interim valuation for application 4 against the order rather than against the invoice — Lucy Adeyemi
due Sep 6 118 Fleet Street — second fix
Draft a nudge ↗
Reconcile Meltham invoice M-2288 against PO-0231 and price the screed preparation line properly — Lucy Adeyemi
due Sep 7 Fleet Street M&E package
Draft a nudge ↗
Submit stage 3 completion certificate application to building control — Jules
due Sep 7 Riverside Tower
Draft a nudge ↗
Re-issue the VI-014 quotation for the feature wall and its builders work, keeping the tea-point element live and unagreed — Deven Rao
due Sep 8 118 Fleet Street fit-out
Draft a nudge ↗
Complete floor 3 first-fix M&E and sign off snagging list — Jules
Overdue — was due Sep 2 Riverside Tower
Draft a nudge ↗
Close out the floor 3 fire-stopping snags raised at the first-fix inspection — Jules
Overdue — was due Aug 29 Riverside Tower
Draft a nudge ↗
Return the signed CNT-001 §4.2 performance-notice acknowledgement to Korso Steel — Jules
Overdue — was due Aug 27 Riverside Tower
Draft a nudge ↗
Issue the £24,000 floors 5-6 delay-penalty account to Korso Steel — Jules
Overdue — was due Aug 24 Riverside Tower
Draft a nudge ↗
Start the CSCS card renewal for Danny Fitzgerald, including re-booking the CITB test — Danny Fitzgerald
Overdue — was due Aug 11 118 Fleet Street fit-out
Draft a nudge ↗